Certification guide · LEED

How C4B contributes to LEED v4.1 BD+C

LEED rewards teams that analyse the site and the building early, before the design is fixed. That is where C4B works: it turns a location into the climate, energy and comfort analysis several LEED credits ask for at pre-design and schematic design. This guide lists every LEED requirement C4B contributes to, what the platform delivers for it, and what outstanding information or analysis is required to earn the point.

Last reviewed23 October 2026

At a glance

What the symbols mean

  • (+)
    Can contribute towards points or creditsThe module delivers some or all of the analysis or evidence the criterion is scored on.
  • →
    Provides design directionThe module shapes the design decision; the credit is earned once the team develops the design in detail and documents it.
  • •
    Provides the data basisThe module supplies some or all of the underlying data; the team interprets it and produces the evidence required to claim the point.
  • –
    No contributionNothing in this scheme that the module speaks to.

The symbol beside each criterion is C4B’s strongest contribution to it; the symbols beside the modules show what each module contributes on its own.

  • 8LEED requirements supported
  • 2(+) Can contribute towards points or credits
  • 4→ Provide design direction
  • 2• Provide the data basis

Coming soon: contributions to 2 more LEED requirements, from modules that are not live yet.

C4BCriterionC4B modules that contribute
(+)IP credit Integrative Process1 pt
  • (+)Preliminary Energy Balance
  • (+)Energy Use: Orientation and Aspect Ratio Optimization
  • (+)Passive Design Strategies for Indoor Environments
  • •Location Information and Data Summary
  • (+)Project Summary report
(+)SS credit Site Assessment1 pt
  • (+)Location Information and Data Summary
  • (+)Sun Path Diagrams
  • (+)Annual and Daily Wind Rose Diagrams
  • (+)Outdoor Comfort (UTCI)
  • •Precipitation Overview
  • •Climate Zone
  • (+)Project Summary report
•SS credit Rainwater Managementup to 3 pts
  • (+)Precipitation Event Intensitycoming soon
  • •Precipitation Overview
  • •Project Summary report
→EA prerequisite Minimum Energy Performanceprerequisite
  • →Preliminary Energy Balance
  • →Passive Design Strategies for Indoor Environments
→EA credit Optimize Energy Performanceup to 18 pts
  • →Preliminary Energy Balance
  • →Energy Use: Orientation and Aspect Ratio Optimization
  • →Passive Design Strategies for Indoor Environments
  • →Suggested Focus for Reducing Overall Carbon Emissionscoming soon
•EA credit Grid Harmonization2 pts
  • •Country Grid Carbon Intensity Assessment
  • •PV and Wind Energy Potential: Yearly Distributioncoming soon
→EA credit Renewable Energyup to 5 pts
  • →PV Energy: Aggregate Yearly Potential
  • →Optimal PV Panel Orientation
  • →Wind Energy: Aggregate Yearly Potentialcoming soon
  • →Geothermal Potential
  • →PV and Wind Energy Potential: Yearly Distributioncoming soon
→MR credit Building Life-Cycle Impact Reductioncoming soonup to 5 pts
  • →Suggested Focus for Reducing Overall Carbon Emissionscoming soon
  • •Country Average Embodied / Operational Energy Ratioscoming soon
→EQ credit Thermal Comfort1 pt
  • →Typical Hourly Temperature, Humidity and Adaptive Comfort
  • →Passive Design Strategies for Indoor Environments
  • →Technical Comfort Strategies
→EQ credit Daylightcoming soonup to 3 pts
  • →Daylight Analysiscoming soon

Integrative process

(+)

IP credit · 1 pt

Integrative Process

C4B modules used

  • (+)Preliminary Energy Balance
  • (+)Energy Use: Orientation and Aspect Ratio Optimization
  • (+)Passive Design Strategies for Indoor Environments
  • •Location Information and Data Summary
  • (+)Project Summary report

What C4B contributes

A preliminary energy balance at concept stage — the early “simple box” analysis the Energy-Related Systems option asks for. It covers massing and orientation, shading, thermal comfort ranges and site conditions, and gives an early energy use intensity to set the target from. Current and future climate data also support the Assessment for Resilience option.

What the team completes

Set and document the energy performance target (EUI). Add the envelope and lighting assessments to the energy analysis. Choose a second analysis — the water budget or the resilience assessment — and show how both fed into the owner’s project requirements and basis of design.

Data to obtain: For the resilience option: flood, seismic and wildfire hazard data from local authorities.

Sustainable sites

(+)

SS credit · 1 pt

Site Assessment

C4B modules used

  • (+)Location Information and Data Summary
  • (+)Sun Path Diagrams
  • (+)Annual and Daily Wind Rose Diagrams
  • (+)Outdoor Comfort (UTCI)
  • •Precipitation Overview
  • •Climate Zone
  • (+)Project Summary report

What C4B contributes

The complete Climate section of the site survey: solar exposure and shading opportunities, seasonal sun angles, prevailing winds, and monthly precipitation and temperature ranges. Precipitation data also informs the rainwater reuse opportunities asked for under Hydrology.

What the team completes

Complete the remaining survey sections and compile the survey document, showing how it informed site design decisions. C4B does not model the existing context: account for the neighbouring buildings, trees and terrain, which change sun, shade and wind on the site.

Data to obtain: Topography, flood hazard areas and water bodies, vegetation, soils, human use and human health effects of the site.

•

SS credit · up to 3 pts

Rainwater Management

C4B modules used

  • (+)Precipitation Event Intensitycoming soon
  • •Precipitation Overview
  • •Project Summary report

What C4B contributes

Monthly precipitation and the intensity of rainfall events at the site. Coming soon: the site-specific rainfall depths for the percentile events the credit is scored on — the 80th, 85th and 90th percentile for 1, 2 or 3 points.

What the team completes

Design the low-impact development and green infrastructure measures — infiltration, retention, rainwater reuse — that keep the chosen event on site. The civil engineer determines the rainfall depth of the percentile event, calculates the retained volume and documents the design.

Energy and atmosphere

→

EA prerequisite · prerequisite

Minimum Energy Performance

C4B modules used

  • →Preliminary Energy Balance
  • →Passive Design Strategies for Indoor Environments

What C4B contributes

Early load reduction through passive strategies and a preliminary energy balance, so the design starts from a lower demand before the systems are sized.

What the team completes

Demonstrate compliance with a whole-building energy simulation to ASHRAE 90.1-2016 Appendix G, or through the prescriptive path, produced by the energy modeller.

→

EA credit · up to 18 pts

Optimize Energy Performance

C4B modules used

  • →Preliminary Energy Balance
  • →Energy Use: Orientation and Aspect Ratio Optimization
  • →Passive Design Strategies for Indoor Environments
  • →Suggested Focus for Reducing Overall Carbon Emissionscoming soon

What C4B contributes

A preliminary energy balance and an orientation and aspect-ratio comparison at concept stage, and passive strategy recommendations — so variants can be compared while changes are still cheap. A view of where the largest carbon savings lie is coming soon.

What the team completes

Points are awarded on the improvement shown in the whole-building energy model to ASHRAE 90.1 Appendix G. The energy modeller builds and runs the model and the MEP team designs the final systems; C4B’s figures are preliminary and set the direction for them.

•

EA credit · 2 pts

Grid Harmonization

C4B modules used

  • •Country Grid Carbon Intensity Assessment
  • •PV and Wind Energy Potential: Yearly Distributioncoming soon

What C4B contributes

The country’s grid carbon intensity, showing how carbon-intensive the power the building draws is. The yearly profile of on-site PV and wind generation, showing when the building would draw from or relieve the grid, is coming soon.

What the team completes

Enrol in a demand response programme covering at least 10 % of on-peak demand, design automated load shedding or shifting, and include demand response in commissioning. On-site generation alone does not earn this credit.

Data to obtain: Demand response programmes offered by the local utility.

→

EA credit · up to 5 pts

Renewable Energy

C4B modules used

  • →PV Energy: Aggregate Yearly Potential
  • →Optimal PV Panel Orientation
  • →Wind Energy: Aggregate Yearly Potentialcoming soon
  • →Geothermal Potential
  • →PV and Wind Energy Potential: Yearly Distributioncoming soon

What C4B contributes

The yearly potential of on-site PV and geothermal energy and the optimal PV orientation — how much of the demand the site can realistically cover. The wind potential and the spread of generation across the year are coming soon.

What the team completes

Design and install the systems and calculate the share of total energy cost they offset. Where the site cannot reach the target, procure renewable energy under a qualifying contract. C4B does not model the existing context: account for the neighbouring buildings, trees and terrain, which shade the roof and facades, change the wind at the site and lower the yield.

Materials and resources

→

MR credit · up to 5 pts

Building Life-Cycle Impact Reductioncoming soon

C4B modules used

  • →Suggested Focus for Reducing Overall Carbon Emissionscoming soon
  • •Country Average Embodied / Operational Energy Ratioscoming soon

What C4B contributes

Coming soon: country-average embodied and operational energy ratios and a recommended focus for reducing carbon, showing whether materials or operation should get the design team’s attention first.

What the team completes

Commission a whole-building life-cycle assessment with an ISO 14044 tool, comparing the design with a baseline building across the required impact categories.

Data to obtain: Material quantities and environmental product data for the LCA.

Indoor environmental quality

→

EQ credit · 1 pt

Thermal Comfort

C4B modules used

  • →Typical Hourly Temperature, Humidity and Adaptive Comfort
  • →Passive Design Strategies for Indoor Environments
  • →Technical Comfort Strategies

What C4B contributes

The comfort band for the site under ASHRAE 55, ISO 7730 and EN 16798, with passive and technical strategies that widen it.

What the team completes

Design HVAC and envelope to meet ASHRAE 55 (or ISO 7730 / EN 16798-1), document the comfort calculations, and provide thermal comfort controls for occupants.

→

EQ credit · up to 3 pts

Daylightcoming soon

C4B modules used

  • →Daylight Analysiscoming soon

What C4B contributes

Coming soon: an annual daylight analysis of a representative room per facade — spatial daylight autonomy (sDA 300/50 %) and annual sunlight exposure (ASE 1000,250 h) to IES LM-83 — showing which window sizes and shading devices reach the credit thresholds while the design is still open.

What the team completes

Simulate every regularly occupied space of the design to IES LM-83 for option 1, provide glare-control devices in every regularly occupied space, and document how any space with ASE above 10 % is designed to address glare.

Data to obtain: Surface reflectances, the visible light transmittance of the glazing, and the buildings and trees that obstruct sky or sun.

Working with C4B on a LEED project

  1. Run the site in C4B early

    Enter the project location at pre-design or concept stage, while orientation, form and the energy concept are still open.

  2. Share the PDF report and the module outputs

    Pass the PDF report and the individual module outputs to the design team, energy modeller and LEED assessor or consultant.

  3. Work through “What the team completes”

    It is the checklist of what remains for each criterion: the analyses, designs and data that turn C4B’s contribution into an awarded credit.

See your site's climate before design begins

Pin any location and get climate, comfort and preliminary energy insight your whole team can read. Start with a 7-day free trial, or book a 30-minute demo.

Free plan; paid plans from €59/month (cancellation takes effect after 12 billing cycles) or €599/year, with a 7-day free trial. No card required. If you add a card during the trial, the plan is charged when the trial ends; otherwise your account moves to the Free plan. See all plans.

Frequently asked questions

Can C4B earn LEED points on its own?

C4B contributes the analysis, design direction or data behind each criterion. Every point is earned by the project team and confirmed by the assessor on the evidence submitted.

Is C4B endorsed by USGBC?

No. C4B is independent of the U.S. Green Building Council (USGBC) and is not a LEED-approved tool. It produces climate, energy and comfort analysis that the team uses and submits as part of its own evidence; the assessor decides what it is worth.

Why do some LEED values say “up to”?

Some credits are awarded on a sliding scale, such as Optimize Energy Performance (up to 18 points) or Rainwater Management (up to 3 points). The guide shows the maximum the credit can award; how much of it the project earns depends on the performance the team demonstrates.

When should we run C4B on a LEED project?

At pre-design or concept stage, while orientation, form and the energy concept are still open. Enter the project location, share the PDF report and the individual module outputs with the design team, energy modeller and LEED assessor or consultant, then work through what the team completes for each criterion.

Sources

Values are LEED points out of 110, as listed on the LEED v4.1 BD+C scorecard for New Construction. Where a credit is awarded on a sliding scale, the maximum is shown. LEED v4.1 BD+C Guide, U.S. Green Building Council, November 2025. Criteria not listed here are outside what the platform addresses. LEED is a trademark of the U.S. Green Building Council.